Planned
Improvements |
| |
|
|
|
Construction
Efforts |
 |
 |
 |
March 21, 2008 |

Acid Phase Digester and Control Building |

Blower & Electrical Building
| 
Chlorine Contact Tanks |

Dismantling of Existing Digested Solids Storage Tank Pump Station |

Preliminary Treatment Facility
| 
T-Lock Liner on the Acid Phase Digester |
April 23, 2008 |

Dewatering Building upper level structural steel being erected.
|

Chlorine Contact Tank construction in the background, Acid Phase Digester Tank and Control Building in the middle of the picture, and the footings for the Gas Blower Building in the foreground.
| 
Blower and Electrical Building (blower room portion of the building is on theleft, electrical room is on the right-front, generator room is right-rear). |

New Secondary Clarifier Nos 5 and 6. These tanks are 160 ft. diameter Crom pre-stressed tanks. The tank on the left is currently filled with water (conducting a water tightness test). |

West end of the Preliminary Treatment Facility.
| 
East end of Preliminary Treatment Facility (grit tank area).
|

Aeration Tank, baffle wall, and t-lock liner. |

48-Inch Aeration Tank influent lines.
|
|
June 16, 2008 |

Blower and electrical building (looking west). Most of the electrical gear is in the building (foreground). |

Acid phase digester in background; Gas blower building in foreground.
| 
Chlorine contact tank addition. The two new tanks are on the left; the two existing on the right. |

Dewatering building on left; Cake storage pad #2 on right. Interior block work on the second level of the dewatering building is nearly complete, roof is on, and precast panels will be delivered shortly. |

Preliminary treatment facility is on the left, primary clarifiers 5 and 6 on right.
| 
Aeration tanks.
|
August 10, 2008 |

Dewatering Building and Cake Storage Pad #2.
|

Upper level of dewatering building. The centrifuges will sit on the concrete pads in the foreground. Support rooms are in the background. Electrical equipment is under the blue tarp.
| 
Overhead Primary Clarifier Effluent Channels are on the left; the Blower and Electrical Building on the right. Blower intake plenum is the large rectangular opening in the middle of the building. The two semi-circle openings are for the blower piping. |

The blower room.
|

The Primary Solids Pump Station and Influent end of the Primary Clarifiers.
| 
Another shot of the Primary Clarifier Effluent Channels. The 36” RAS discharge piping is just visible under the channel. Note the T-lock on the channel walls. |

Secondary clarifier equipment (Envirex).
|

Chlorine Contact Tank Nos. 3 and 4.
| 
Inside of the Acid Phase Digester.
|

Outside of the Acid Phase Digester. Gas Booster Building is on the left. Acid Phase Digester Control Building slab work is in front of the digester. The new Chlorine Contact Tanks are in the background.
|

Sodium Hypochlorite storage tanks. A canopy roof will eventually cover the tanks.
| 
Gas flare structure.
|