Temporary Lane Closures/Detour Along Diamond Springs Road for Paving Work

Body

 

Virginia Beach – Motorists are advised that HRSD will begin roadway restoration with nightly pavement milling, asphalt overlay, and restriping operations. This pavement work will require temporary lane closures within four general locations. These locations include the following street intersections along Diamond Springs Road: Aragon Drive, Bayside Road, Northampton Boulevard, and Wesleyan Drive. While these locations will remain accessible, motorists may experience delays.

Additionally, a detour is planned at one location at the right turn ramp from southbound Diamond Springs Road to westbound Northampton Boulevard. Detour signage will be in place. These lane closures and detour are scheduled to begin as early as the evening of November 1st and should take one week to complete.

map image

This work is weather dependent and subject to change or require additional time. Please visit the Diamond Springs Sewer Replacement on HRSD.com for updates and schedule changes.

HRSD's mission is to protect public health and the waters of Hampton Roads by treating wastewater effectively. A political subdivision of the Commonwealth of Virginia, HRSD was created by public referendum in 1940 and currently serves 18 cities and counties in southeast Virginia, an area with a population of 1.7 million.

###