Skip to main content
  • Pay Bill Now
  • Contact Us
  • Careers
  • SWIFT
  • Investors
  • Newsroom
  • FOIA

HRSD

Menu

  • About HRSD

    Hampton Roads sunset

    HRSD promises to treat wastewater and recover natural resources to protect public health and the environment.

    Who We Are

    We return treated effluent to nature while nurturing our delicate ecosystems and their inhabitants.

    • About Us
    • Awards
    • History

    Organization

    We employ talented people who take pride in doing their best for the environment

    • Chart
    • Commission
    • General Management
    • Senior Leadership

    Divisions

    • Communications
    • Engineering
    • Finance
    • Information Technology
    • Operations
    • Talent Management
    • Water Quality

    Quick Links

    • 2023 HRSD Climate Change Planning Study
    • Annual Comprehensive Financial Report
    • Budget
    • Capital Improvement Program (CIP)
    • Consumer Annual Report
    • HRSD Strategic Plan
    • Making Waves Blog
    • Rate Schedule
    • Wastewater Surveillance
  • Customers

    Residential

    • Pay or View Bill
    • Self-Service
    • Customer Service
    • FAQs

    Non-Residential

    • Customer Resources
    • P2 Awards
    • Report a Spill
    • FAQs
  • Doing Business with HRSD

    Work With Us

    • Bids and RFPs
    • Development Services
    • Procurement
    • Engineering
    • HRSD Industry Outreach
    • SWIFT Industry Outreach

    Technical Information

    • Design and Construction Standards
    • GIS Public Viewer
    • Record Drawings Requests
  • Initiatives and Programs

    Education

    • Boater Education
    • Classroom
    • HRSD's Approach to Managing PFAS
    • My Flush Counts
    • Schedule a Tour

    Research & Development

    • HRSD's Approach to Managing PFAS
    • Wastewater Surveillance

    Scholarships & Grants

    • HRSD Environmental Improvement Fund Grant
    • HRSD Scholarship
    • Voluntary Septic to Sewer Connection Program

    Working Together

    • askHRgreen.org
    • Chesapeake Oyster Alliance
    • EPA Consent Decree
    • Help 2 Others
    • Virginia Living Museum

    Local Government

    Since 1992 HRSD has provided municipal environmental services to Virginia government agencies, sharing technical expertise and resources. More than 50 agencies have benefited from environmental monitoring and analysis, training and consulting—all provided

    • Municipal Assistance Program
  • Home
 

South Norfolk Pump Station and Sanitary Sewer Replacement Project FAQs


The project is necessary in order to provide reliable conveyance of sewage in the South Norfolk area. Replacing the existing pump stations with new modernized infrastructure will help to ensure wastewater capacity is adequate and will optimize HRSD’s ability to protect public health and the environment for decades to come.


No. Although this program includes designing new pump stations and sewer lines that can withstand flooding from major storm events, it is not intended to collect or eliminate storm water. The new pump stations and sanitary sewer lines will have increased capacity which will minimize sanitary sewer overflows (SSOs), but the system is not designed to be a stormwater collection and treatment system.


During the design phase of this project (ongoing through Spring 2024), surveyors or contractors may be seen working in the area. All survey work during this time will be completed in public rights-of-way. If access to a private property is needed, permission will be secured in advance with the property owner. 


Disruptions to traffic will be minimized, and, in most cases, a single lane of traffic will be maintained. Some road closures will be necessary, and detours will be in place. Access to homes/businesses will be available. 


The contractor will ensure that access to residences and at least one entrance to businesses will be maintained throughout construction. Trash and mail services will not be affected. If necessary, the contractor will move trash containers from within a work zone to an area accessible for pickup and will be responsible for returning them to each residence.


To protect residential structures during construction, over 35 vibration monitoring locations will be installed for use throughout the installation of sanitary sewer lines. Vibration monitoring will be carried out in advance of and during construction. Alerts are provided to contractor if the vibrations reach a particular level and work will be stopped if these vibrations exceed federally-established levels that may cause damage to residential structures.


For the sanitary sewer pipeline work occurring on Park Avenue, construction may occur Monday through Saturday between the hours of 7 a.m. and 7 p.m. However, for the other phases of the project, work will typically take place Monday through Friday during daylight hours (8 a.m. - 4 p.m.). There may be times when extended hours, work at night, or weekend work is necessary, but changes in work hours will be announced ahead of time to impacted individuals.


Your sewer service will be temporarily interrupted if work is to be performed on the sewer lateral pipe that serves your property. The contractor will notify you before your lateral is to be rehabilitated so you can plan appropriately. Sewer service typically will be restored within several hours. Your water service should not be affected by this program.


Where sewer and lateral pipes are dug up, asphalt, curb, gutters, driveway aprons, and grass will be removed and then restored upon completion of the program.


The typical construction noises such as equipment engines, back-up alarms, materials being delivered, diesel generators, air compressors, sawing, etc. should be anticipated during daylight hours (8 a.m. - 4 p.m.). If night work is to occur, affected residents will receive a notification ahead of the work. 


An off-site storage area in the program vicinity will be used for the storage of most of the equipment and supplies. Some supplies may be contained within the active work zone, in the public right-of way.


Construction workers will not be allowed to park their personal vehicles on the public streets. However, work trucks will be allowed to park within the active work zone.


The estimated cost for the program is $35.8 million and is financed by the wastewater and wastewater treatment fees paid by HRSD customers.


The project website will be updated on a monthly basis regarding any schedule changes or project updates and can be accessed at www.hrsd.com/construction-status. You may also sign up at www.hrsd.com/subscriptions to receive an email notification whenever the website has an update about the program.

Summary

  • Facebook
  • Twitter
  • YouTube

Our Promise

We promise to treat wastewater and recover natural resources to protect public health and the environment.

Our Vision

Our communities will have clean waterways and reliable water resources for generations to come.

Privacy Policy

Main Office

1434 Air Rail Avenue
Virginia Beach, VA 23455

— or —

P.O. Box 5911
Virginia Beach, VA 23471-0911

Phone

757.460.2261

  • Billing and Payments Billing and Payments
  • Career Opportunities Career Opportunities
  • Construction Status Construction Status
  • Customer Service Customer Service
  • HRSD News and Updates HRSD News and Updates
  • Learn More Learn More

Awards + Recognition

Governor's Environmental Excellence
2025 Gold Award for James River Land Improvement — Trails Phase 1