Construction Notice Update #2 for the City of Onley, VA - January 2023
--Pipe Installation Work to Begin--
--Pipe Installation Work to Begin--
PROJECT UPDATES – January 2023
--Utility Work to Continue--
HRSD, your regional wastewater treatment utility, will continue work to install a sanitary sewer pipeline at the intersection of Rogers Avenue and Old Buckroe Road to the intersection of Old Buckroe Road and Nickerson Boulevard. This work should take place primarily between the hours of 8 a.m. to 6 p.m., Monday – Friday.
“Portsmouth Sanitary Sewer Inflow & Infiltration Reduction”
VIP Service Area I/I Reduction Phase I & III - Portsmouth
HRSD Capital Improvement Program Project (VP018301/VP018303)
Webpage Reviewed: January 7, 2025
HRSD, in coordination with the City of Portsmouth, is undertaking a project to inspect and rehabilitate or replace City sanitary sewer infrastructure at two primary locations. A program of High Priority Projects will be constructed through 2030 as part of HRSD’s Regional Wet Weather Management Plan. Projects were selected based on their ability to provide the greatest environmental benefits. Rehabilitation of sanitary sewer within two areas of the City of Portsmouth are part of the larger High Priority program. This work is ultimately being conducted to reduce the risk of sanitary sewer overflows during heavy rain events such as Nor’easters or hurricanes. Please see the Project Map in the “Project Map” tab below to view a map of the entire project area in Portsmouth. To see more detailed maps of the two sections to be assessed, please click here.
Project Cost: $29,668,000
August 2024 - Smoke Testing Notice
October 2023 - Smoke Testing Notice
August 2023 - Smoke Testing Notice
December 5, 2025
This project is currently in the design phase. More information on construction areas and timeline should be available in late spring 2026.
The scope of construction will be affected by pending inspection results; therefore, specific road impacts are not yet fully defined. However, comprehensive traffic control plans will be implemented prior to construction to minimize inconvenience.
May 2022 through Early 2024
Anticipated Summer 2026
TBD
Immediately following construction when seasonably appropriate.
This project is a necessary to increase the reliability of the sewage collection system by replacing aging infrastructure. This project includes sanitary sewer condition investigation and rehabilitation as part of a larger program to reduce sewage overflows during rainstorms.
Precise construction locations and methods will be determined pending inspections results from condition assessment activities. However, it is anticipated that disruptions to traffic will be minimized, and in most cases, a single lane of traffic will be maintained. In the event that detours are necessary during some phases of construction, signage will be placed in advance.
The contractor will ensure that access to residences and at least one entrance to businesses will be maintained throughout construction. Trash and mail services will not be affected. If necessary, the contractor will move trash containers from within a work zone to an area accessible for pickup and will be responsible for returning them to each residence.
Work will typically take place Monday through Friday during daylight hours (8 a.m. - 5 p.m.). However, there may be times when extended hours, work at night, or weekend work may be necessary.
Your sewer service will be temporarily interrupted if work is to be performed on the sewer lateral pipe that serves your property. The contractor will notify you before your lateral is to be rehabilitated so you can plan appropriately. Sewer service typically will be restored within several hours. Your water service should not be affected by this project.
Where sewer and lateral pipes are dug up, asphalt, curb, gutters, driveway aprons, and grass will be removed and then restored upon completion of the project. Most of the project work will be located within the public and private right-of ways, and as much of the construction as practical will be “trenchless,” meaning the contractor will not need to dig up the street to fix the pipes. However, certain sections of sewer may be in very poor condition and may require replacement by digging.
The typical construction noises such as equipment engines, back-up alarms, materials being delivered, diesel generators, air compressors, sawing, and associated activities should be anticipated.
It is anticipated that the contractor will negotiate with a private property owner for a storage area in the project vicinity, and this site will be used for most of the equipment and supplies. The contractor will keep some supplies within the active work zone, in the public right-of way.
Construction workers will not be allowed to park their personal vehicles on the public streets. However, work trucks will be allowed to park within the active work zone.
The estimated cost for the project is approximately $30 million and is financed by the wastewater treatment fees paid by HRSD customers.
Regular project updates are posted on the HRSD website at www.hrsd.com/construction-status. You may also sign up at www.hrsd.com/subscriptions to receive an email notification whenever the website has an update about the project.
Brown and Caldwell, Virginia Beach, VA
Christopher Wilson
Duke’s Root Control, Inc., Virginia Beach, VA
David Johnston
PROJECT UPDATES – December 2022
In February 2023, HRSD will continue its sanitary sewer replacement project with work beginning on Park Avenue between Bainbridge Boulevard and Rodgers Street. Construction will include the excavation of the road and sidewalk to replace the existing sanitary sewer pipes.
--Utility Work to Continue--
HRSD, your regional wastewater treatment utility, has begun work to install a sanitary sewer pipeline along Wythe Creek Road. This work should take place primarily between the hours of 7 a.m. to 5 p.m., Monday – Friday.
--Shoring Work to Begin--
HRSD, your regional wastewater treatment utility, will begin work to install a new sanitary sewer pump station and rehabilitate existing sanitary sewer pipes and manholes in the Phoebus neighborhood. This work should take place primarily between the hours of 7 a.m. to 5 p.m., Monday – Friday.
PROJECT UPDATES – NOVEMBER 2022

On November 8th (Construction Notice #13), we informed you that all manhole and initial road restoration on Park Avenue was estimated to be completed prior to Thanksgiving.