This project is necessary to replace the sewer pipe due to structural damage that occurred in March 2023 from an alleged third party. This pipe conveys sewage flows collected from the Great Bridge area to the HRSD Atlantic Treatment Plant, and the damage resulted in total inoperability of the pipe.
-
Disruptions to traffic will be minimized, and in most cases, a single lane of traffic will be maintained. Detours are anticipated around Callison Drive, and flagging will be used to help direct traffic as needed.
-
The contractor will ensure that access to residences and at least one entrance to businesses will be maintained throughout construction. Trash and mail services will not be affected. If necessary, the contractor will move trash containers from within a work zone to an area accessible for pickup and will be responsible for returning them to each residence.
-
Work will typically take place Monday through Friday during daylight hours (7 a.m. - 5 p.m.). However, there may be times when extended hours, work at night, or weekend work may be necessary.
-
The work required to connect the new sewer pipe to the pump stations on Locks Road and Callison Drive may result in temporary sewer service interruption, likely during nighttime hours. The contractor will notify you before work begins so you can plan accordingly. Sewer service typically will be restored within several hours. Your water service should not be affected by this project.
-
Where sewer pipes are dug up, asphalt, curb, gutters, driveway aprons, and grass will be removed and then restored upon completion of the project.
-
The typical construction noises such as equipment engines, back-up alarms, materials being delivered, diesel generators, air compressors, sawing, and associated activities should be anticipated. The noisiest pieces of equipment to be used during construction include the excavator, compactor, and vibratory roller.
-
The contractor has negotiated with a private property owner for a storage area in the project vicinity, and this site will be used to store most of the construction equipment and supplies. The contractor will keep some supplies within the active work zone, in the public right-of-way.
-
Construction workers will not be allowed to park their personal vehicles on the public streets. However, work trucks will be allowed to park within the active work zone.
-
The estimated construction cost for the project is approximately $6.2 million and is financed by the wastewater treatment fees paid by HRSD customers.
-
Regular project updates are posted on the HRSD website at www.hrsd.com/construction-status. You may also sign up at www.hrsd.com/subscriptions to receive an email notification whenever the website has an update about the project.