"Chesapeake Boulevard Pump Station Replacement"
Lafayette Norview-Estabrook Pump Station Replacements
HRSD Capital Improvement Program Project (VP015430)Webpage Reviewed: September 3, 2026
-
HRSD, your regional wastewater treatment utility, is undertaking a project to replace the sanitary sewer pump station located at 5734 Chesapeake Boulevard. This effort will improve performance and reliability within HRSD’s sanitary sewer system. This project includes the demolition of the existing pump station, construction of a new pump station, the installation of new sanitary sewer piping, roadway restoration, and site improvements on the pump station site. This replacement project will also improve the sewer system’s performance and ensure continued, reliable sewer service in the future. The contractor will maintain a clean job site and minimize traffic disruption.
Project Cost: $12,600,000
-
Notices
-
August 28, 2026
Mobilization to the site and staging for upcoming construction is expected to occur in late September 2026.
-
The work will be confined to HRSD property and the public right-of-way. Work in the right-of-way will include pipeline replacement and roadway resurfacing. Construction traffic will be entering and exiting the site on the northbound lanes on Chesapeake Boulevard at the intersection with Wayne Circle. Comprehensive traffic control plans will be implemented to minimize inconvenience.
-
- Staging:
-
Late September 2026
- Construction:
-
Fall 2026 - Spring 2029
- Restoration:
-
Immediately following construction when seasonably appropriate
-
-
This project is necessary to upgrade aging infrastructure that will help ensure HRSD’s ability to protect public health and the environment for decades to come.
-
Although the majority of the project work will be located within HRSD property, some work will be completed within the roadway. Some lane closures on northbound Chesapeake Boulevard near the Wayne Circle intersection are anticipated. Comprehensive traffic control plans will be implemented to minimize inconvenience.
-
The contractor will ensure that access to residences and at least one entrance to businesses will be maintained throughout construction. Trash and mail services should not be affected. If necessary, the contractor will move trash containers from within a work zone to an area accessible for pickup and will be responsible for returning them to each residence.
-
Work will typically take place Monday through Friday from 7 a.m. - 7 p.m. There may be temporary exceptions in certain locations to reduce impacts to the community, adhere to City ordinances, or as required in order to complete the work.
-
Your water and sewer service should not be interrupted during the project duration. In the unlikely event that an interruption occurs, the contractor will notify you.
-
Where sewer pipeline is installed, asphalt, curb, gutters, driveway aprons, and grass will be removed and then restored upon completion of the project.
-
The typical construction noises such as equipment engines, back-up alarms, materials being delivered, diesel generators, bypass pumps, air compressors, sawing, etc. should be anticipated.
-
The contractor has negotiated with a private property owner for a storage area in the project vicinity and this site will be used for most of the equipment and supplies. The contractor will keep some supplies within the active work zone, in the public right-of-way.
-
Construction workers will not be allowed to park their personal vehicles on the public streets. However, work trucks will be allowed to park within the active work zone.
-
The estimated cost for the project is $12.6 million and is financed by the wastewater treatment fees paid by HRSD customers.
-
Regular project updates are posted on the HRSD website at www.hrsd.com/construction-status. You may also sign up at www.hrsd.com/subscriptions to receive an email notification whenever the website has an update about the project.
-
- HRSD Project Manager:
- Ryan Delo
-
- Engineering Consultant Firm:
-
Hazen and Sawyer, Virginia Beach, VA
- Engineering Consultant Project Lead:
-
Scott Morrow, P.E.
- Contractor:
-
MEB, Chesapeake, VA
- Contractor Field Project Manager:
-
TBD