Great Bridge Boulevard Sanitary Sewer Improvements

Body

--Utility Work to Continue--

HRSD, your regional wastewater treatment utility, will begin work to connect/tie-in the newly installed sewer pipe to the existing sewer pipe at the intersection of River Creek Road and Campostella Boulevard. The preparation for this will take place primarily between the hours of 7 a.m. to 5 p.m., Monday – Friday. The actual connection/tie-in to the existing sewer pipe will need to be completed during weekday nighttime hours while sewer flows are lower.

Construction Update:

  • Beginning as early as April 9th, the contractor will begin work to connect/tie-in the newly installed sewer pipe to the existing sewer pipe at the intersection of River Creek Road and Campostella Boulevard.
  • The preparation work will take place during the daytime and within the right-of-way. Nighttime work is not anticipated during the preparation work, but if it needs to occur, the contractor will notify you in advance. The tie-in will take place at nighttime.
  • Be aware, traffic patterns will shift and will include road closures and detours to through traffic. Flaggers will be onsite, as needed, to direct traffic. Access to homes/businesses will be available.
  • This work should not affect your water or sewer services.
  • This portion of the work is anticipated to be completed in 2-3 weeks.
  • Due to the nature of construction, work is weather and situation dependent, and
    dates are subject to change or be extended.

While our project team works diligently to minimize impacts, you may notice increased noise, traffic, crews, and heavy equipment (with back-up safety alarms) associated with construction. Please take care when traveling around the construction area and for your safety, do not enter the site.

Please visit the project’s webpage for more information and updates: www.hrsd.com/great-bridge-boulevard-sanitary-sewer-improvements.

Thank you for your support of this effort to help achieve HRSD’s vision:

Our communities will have clean waterways and reliable water resources for generations to come. 


 

Should you have any questions or comments, you may contact:

HRSD Public Information Specialist:

Lisa Bolen 
(757) 460-7000
lbolen@hrsd.com

HRSD Project Manager:

Phil Hubbard
projects@hrsd.com

Onsite Inspector (Emergent Concerns):

Harry Hardy
(757) 719-5844