"Thompson Avenue Pump Station & West Point and Urbanna Sewer Rehabilitation"
West Point Pump Station No. 4 (Thompson Avenue) Rehabilitation (MP015100)
Small Communities Rehabilitation Phase IV (MP014700) -
HRSD is undertaking a project to rehabilitate a West Point Pump Station at 470 Thompson Avenue in West Point. Additionally, sanitary sewer and manholes located at several locations throughout West Point and Urbanna will be rehabilitated. Rehabilitating the existing pump station and gravity sanitary sewer pipes with new modernized infrastructure will help to ensure wastewater capacity is adequate and will optimize HRSD’s ability to protect public health and the environment for decades to come. See the Project Map and Roads Affected sections for more location details.
-
Notices
October 2023 - Construction Notice #9
July 2023 - Construction Notice #8
May 2023 - Construction Notice #7
May 2023 - Construction Notice #6
May 2023 - Construction Notice #5
April 2023 - Construction Notice #4
April 2023 - Construction Notice #3
April 2023 - Construction Notice #2
March 2023 - Notice to Neighbors
-
April 9, 2024
The Contractor completed the gravity sewer pipeline installation and manholes in the West Point and Urbanna areas and is currently performing less impactful rehabilitation efforts to the gravity sewer system. Traffic patterns will shift and will include partial street closures. Traffic control measures and detours will be in place. Access and parking for residents and businesses will be maintained.
Additionally, the Contractor is working in West Point along Thompson Avenue on construction of the new pump station. No impacts to residents and businesses should be realized as a part of this work.
-
The work will be confined to HRSD property and the public right of way; construction traffic will be entering and exiting the site on Thompson Avenue. Short term traffic control consisting of flaggers will be implemented for work in the public right of way. Temporary traffic control measures will impact the following streets:
- West Point
- Corner of Odi Street and Bagby Street
- Lee Street and 19th Street
- 7th Street near Main Street
- 4th Street and Main Street
- Thompson Avenue at the pump station site (deliveries)
- Urbanna
- Virginia Street from Waverly Road to Cross Street
- No full road closures or detours are anticipated.
- West Point
-
- Staging:
-
April 2023
- Construction:
-
Spring 2023 - Fall 2024
- Restoration:
-
Immediately following construction when seasonably appropriate
-
-
The project is necessary to provide reliable conveyance of sewage in the West Point and Urbanna Project Areas. Rehabilitating the existing pump station and gravity sewer with new modernized infrastructure will help to ensure wastewater capacity is adequate and will optimize HRSD’s ability to protect public health and the environment for decades to come.
-
Due to the nature of this project being focused on rehabilitation, each work site area is defined by location of the existing infrastructure. All work will rehabilitate infrastructure in its current location.
-
The project consists of work to be done on HRSD property as well as sewer pipeline work to be installed in the public right of way. Much of the pump station work will be conducted on HRSD property and will have minimal impact on traffic. For the sewer pipeline work being installed in the public right of way, single lane traffic will be maintained throughout most of construction. Flagging may be used to help direct traffic as needed. Road closures and detours are not anticipated.
-
The contractor will ensure access to residences will be maintained throughout construction. Trash and mail services should not be affected. If necessary, the contractor will move trash containers from within a work zone to an area accessible for pickup and will be responsible for returning them to each residence.
-
Work will typically take place Monday through Friday during daylight hours (7 a.m. - 5 p.m.). However, there may be times when extended hours, work at night, or weekend work may be necessary.
-
The work required to rehabilitate or replace sanitary sewer lines may require the lateral pipe serving your property to be removed from service and subsequently reinstated once work on the main sewer pipe has completed. This interruption of service will be temporary, and the contractor will notify you before work begins so you can plan accordingly. Sewer service typically will be restored within several hours. Your water service should not be affected by this project.
-
Where sewer and lateral pipes are excavated, asphalt, curb, gutters, driveway aprons, and grass will be removed and then restored upon completion of the project.
-
The typical construction noises such as equipment engines, back-up alarms, materials being delivered, diesel generators, air compressors, sawing, etc. should be anticipated.
-
The contractor will store materials and supplies in their own controlled laydown areas and in areas of the street temporarily closed for construction. The contractor will transport them throughout the project area as they are needed.
-
Construction workers will not be allowed to park their personal vehicles in areas impacting residents or services such as mail and trash collection. Work trucks will be allowed to park within the active work zone.
-
The estimated cost for the project is $2.9 million and is financed by the wastewater treatment fees paid by HRSD customers.
-
Regular project updates are posted on the HRSD website at www.hrsd.com/construction-status. You may also sign up at www.hrsd.com/subscriptions to receive an email notification whenever the website has an update about the project.
-
- Public Information Specialist:
- Shawn Maxfield 757.833.7483 (Office)
- Town of West Point Contact:
- Holly McGowan
- Town of Urbanna Contact:
- Roy Kimes
- Onsite Inspector (Immediate/Emergent Concern):
- RK&K
- HRSD Project Manager:
- Ted Denny
- Additional Information:
- Projects@hrsd.com
-
- Director of Communications:
- Leila Rice, APR 757.460.7056 (Office) 757.642.1321 (Cell)
-
- Engineering Consultant Firm:
-
RK&K Engineering, LLP., Virginia Beach, VA
- Engineering Consultant Project Lead:
-
Kevin Hyskell
- Contractor:
-
J. Sanders Construction, West Point, VA
- Contractor Field Project Manager:
-
Ben Sanders