Wilroy Pressure Reducing Station and Offline Storage Facility
Wilroy Pressure Reducing Station and Off-line Storage Facility
HRSD Capital Improvement Program Project (NP014000)

 

Webpage Reviewed: November 18, 2025


HRSD is undertaking a project to construct a pressure reducing pumping station (PRS) and an offline storage facility. The new facility will be located on HRSD property at 1941 Wilroy Road in Suffolk and is designed to relieve pressures to the wastewater sewer system during wet weather events. What this means is during wet weather events that may cause the sanitary sewer system to be inundated with rainwater, the excess flow will be diverted from the sewer pipes to the storage facility. It will be held at the storage facility temporarily. Once the pressure on the sanitary sewer system has returned to normal, the sewage will be released from the storage facility and will flow back into the sewer pipes, where it will then continue on to the treatment plant for treatment. This will help reduce the occurrence of sanitary sewer overflows, which are improvements that are mandated by the Environmental Protection Agency (EPA). The facility will improve system operations, increase flow capacity, and provide reliable sanitary sewer infrastructure for areas of Suffolk and Isle of Wight County.

  • The storage facility will have a volume of 3 million gallons.
  • The storage facility will be fully enclosed with a carbon scrubbing odor control system.
  • The existing HRSD sewer pipe along Wilroy Road will be extended from QVC Drive to the PRS to connect the PRS to the sewer system (please see the Project Map).
  • The City’s water main pipe along Wilroy Road, directly across from the project site, will be extended by 400-feet.

Project Cost: Approximately $52,250,000


Traffic Advisory - April 15, 2024

CHESAPEAKE HRSD crews will install sanitary sewer pipeline in Great Bridge Boulevard between Bainbridge Boulevard and Lincoln Road beginning as early as Monday, April 22 with work expected to continue for up to 3 months. 

Read More


alertSubscribe

King William Central Crossing Pump Station Rehabilitation
King William Central Crossing Pump Station Rehabilitation (MP015300) 


HRSD, your regional wastewater treatment utility, is undertaking a project to rehabilitate the King William Central Crossing Pump Station located at 123 Central Crossing Terrace, that is nearing the end of its useful life. Rehabilitating the existing pump station with new modernized infrastructure will improve the systems performance and optimize HRSD’s ability to protect public health and the environment for decades to come.

Project Cost: Approximately $2.3 Million

Construction Notice Update #9 for the City of Newport News - April 2024

--Utility Work to Continue--

HRSD, your regional wastewater treatment utility, will continue work to replace a sanitary sewer pipeline located along Brick Kiln Boulevard. This work should take place primarily during daytime hours. 

Read More

Construction Notice Update #8 for the City of Newport News - April 2024

--Utility Work to Continue--

HRSD, your regional wastewater treatment utility, will continue work to replace a sanitary sewer pipeline located along Criston Drive near River Bend Court. This work should take place primarily during daytime hours. 

Read More

Traffic Advisory - April 9, 2024

VIRGINIA BEACH – Motorists are advised that HRSD crews will be performing sanitary sewer pipeline improvements on Arctic Avenue that require a road closure between 28th and 30th streets. During this work, through traffic will follow a signed detour using 28th Street, Pacific Avenue, and 30th Street as indicated on the map below. Local traffic will continue to have access to homes/businesses. The detour is scheduled to begin as early as April 15 and is expected to remain in place through the end of April.

Read More

Construction Notice Update #7 for Wachapreague VA - April-August 2024

--Sewer Pipe Installation Work to Begin--

Read More

Notice to Neighbors - April 2024

HRSD, your regional wastewater treatment utility, in coordination with the City of Virginia Beach, is planning a project in your neighborhood to rehabilitate existing HRSD sanitary sewer pipelines that are nearing the end of their useful life. This rehabilitation project will ensure continued, reliable sewer service in the future. The answers to some Frequently Asked Questions (FAQs) are provided here.

Read More