CONSTRUCTION NOTICE CITY of Newport News May 2018

-- Final Phase of Sewer System Replacement Work --

HRSD, your regional wastewater treatment utility, nears completion of a multiyear project to
replace the aged sewer pipelines within the Rivermont neighborhood and pumping station
located on Center Avenue. HRSD recently completed the construction of a new pumping
station allowing for the decommissioning and removal of the older station allowing the
remaining pipeline replacement and vault installation work to begin.

Read More

CONSTRUCTION NOTICE UPDATE for HAMPTON February /March 2018

 

--Portion of Chesapeake Avenue Closing to Thru Traffic--

HRSD, your regional wastewater treatment utility, is replacing a sanitary sewer pipeline located along a portion of Chesapeake Avenue from the Monitor Merrimac Overlook Park to the HRSD Pumping Station near Claremont Avenue. This work should take place primarily between the hours of 8 a.m. to 4 p.m., Monday through Friday.

Read More

Procurement Assistance

ERP Help Desk

Email:  erphelp@hrsd.com
 
 

Shanna Pankey

Procurement Coordinator
Email:  spankey@hrsd.com
Phone:  757.460.7345

Terrel Austin

Procurement Specialist
Email:  taustin@hrsd.com
Phone:  757.460.7314

Katelyn Collins, CPPB

Procurement Specialist
Email:  kcollins@hrsd.com
Phone: 757.613.8498

Stephanie Atienza, CPCP, CPPB

Procurement Analyst
Email:  satienza@hrsd.com
Phone:  757.460.7313

Amy Murphy, CPPB, VCO

Director of Procurement
Email:  amurphy@hrsd.com
Phone:  757.460.7312

Kiara Jones

Procurement Assistant
Email:  kjones@hrsd.com
Phone:

Tamara Johnson

Procard and Contract Administrator
Email:  tkjohnson@hrsd.com
Phone:  757.460.7309

Rob Bittler

Procurement Specialist
Email:  rbittler@hrsd.com
Phone:  757.460.7095

Caitlin Geer, CPPB

Procurement Specialist
Email:  cgeer@hrsd.com
Phone:  757.460.7311

Dominique Solano, CPPB

Procurement Analyst
Email: dsolano@hrsd.com
Phone: 757.460.7316

CONSTRUCTION NOTICE CITY of NORFOLK February 2018

--Work To Begin--

HRSD, your regional wastewater treatment utility, is undertaking a project to rehabilitate and perform maintenance of the internal systems of multiple pump stations within the cities of Norfolk and Chesapeake. One of these sites is the Norview Avenue Pump Station, located at 869 Norview Avenue in the City of Norfolk. This work should take place primarily between the hours of 7 a.m. to 5 p.m., Monday through Friday.

Read More

In an effort to assist our Small Communities customers in determining which forms and supporting documentation are required for review and comment by the HRSD Hydraulic Capacity Section (HCS), use the flowchart provided herein to determine under which Case your project falls under. A separate document is provided describing the information needed for submittals for each Case.

Download Flowchart

HRSD SC Dev Review Document Requirements

HRSD Small Communities Development Review Document Requirements

All applicants please ensure to use the HRSD SC Development Review Flowchart to determine which CASE from the list below represents your project, and submit pertinent documents to developrequest@hrsd.com.

Case A

Submit the following:

  1. Gravity Sewer Connection for Single/Duplex Residential Unit Application 
  2. A property survey plat identifying:
    1. location of existing sewer cleanout
    2. alignment of the service line
    3. NOTE: If the existing cleanout is located within property lines, it must be relocated at the edge of the VDOT right-of-way (ROW) or HRSD utility easement and adjacent to the property line.
  3. A map with aerial view of the property under review.  At minimum, the map should include a roadway, intersection, and/or other landmarks so that the location of the property in relation to the existing public sewer infrastructure can be determined by HRSD staff.
     

Case B

Submit the following:

  1. Gravity Sewer Connection for Single/Duplex Residential Unit Application 
  2. A property survey plat identifying:
    1. location of new sewer cleanout 
    2. alignment of the service line
  3. A map as described in CASE A above
     

Case C

Submit the following:

  1. Gravity Sewer Connection for Single/Duplex Residential Unit Application 
  2. A property survey plat identifying:
    1. location of proposed connection point to the existing gravity sewer main
    2. location of new sewer cleanout 
    3. alignment of sewer lateral
    4. alignment of service line
  3. A map as described in CASE A above
     

Case D

Submit the following:

  1. Pressurized Sewer Connection for Single/Duplex Residential Unit Application 
  2. A property survey plat identifying:
    1. private pump station location
    2. alignment of private force main section 
    3. alignment of HRSD force main section
    4. locator box where the private force main section crosses into VDOT ROW or HRSD utility easement
    5. 2nd locator box at the connection point with the existing public force main
    6. a map as described in CASE A above
  3. Pump Station Information Form 
     

Case E

Submit the following:

  1. Gravity Sewer Connection for Single/Duplex Residential Unit Application 
  2. A property survey plat identifying:
    1. private pump station location
    2. alignment of private force main section 
    3. alignment of HRSD force main section
    4. locator box where the private force main section crosses into VDOT ROW or HRSD utility easement
    5. existing HRSD sewer manhole receiving the flow
    6. a map as described in CASE A above
  3. Pump Station Information Form
     

Case F

Submit the following:
1.    Gravity Sewer Connection for Residential Subdivisions, Commercial/Industrial Site Plan Application 
2.    HRSD Sanitary Sewer Flow Calculations Worksheet
3.    Full set of site plans
 

Case G

Submit the following:
1.    Pressurized Sewer Connection for Single/Duplex Residential Unit Application 
2.    HRSD Sanitary Sewer Flow Calculations Worksheet
3.    Pump Station Information Form
4.    Full set of site plans

Case H

Submit the following:
1.    Pressurized Sewer Connection for Residential Subdivisions, Commercial/Industrial Site Plan  Application 
2.    HRSD Sanitary Sewer Flow Calculations Worksheet
3.    Pump Station Information Form
4.    Full set of site plans
 

Case I

Submit the following:
1.    Small Communities VDOT Roadway, Drainage, or Private Utility Improvements Form
2.    Full set of plans